Requirements Desk

Prepare a made-to-print RFQ

Check what a shop needs to quote your part, test your lead time against your target, and compare the quotes you receive on landed cost. Nothing is quoted or sent to a shop here.

12 of 13 items you can state here are stated Still open: Packaging and cosmetic standard. 2 more to attach when you send (drawing and model; commercial breakdown).

Change anything; the summary, schedule and comparison update as you type.

The part
Delivery and paperwork
Inspection and documents

What each shop needs

  • Stated
    Process: CNC milling
  • Stated
    Material and grade: 6061-T6 aluminum
  • Stated
    Tolerances: +/- 0.005 in on the mounting holes and bore; +/- 0.010 in general
  • Stated
    Finish: Type II clear anodize, threads masked
  • Stated
    Quantity: 500 parts
  • Stated
    Price breaks: Price at 250, 500, 1,000
  • Stated
    Arrival: 28 days from order to arrival at your door
  • Stated
    Partial shipments: Acceptable
  • Stated
    Inspection and documents: First article inspection; Material certificate; Certificate of conformance
  • Stated
    Shop quality system: ISO 9001
  • Stated
    Ship to: Minneapolis, MN
  • Stated
    Export control: Not export-controlled
  • Open
    Packaging and cosmetic standard: to be stated
    Say how parts are packed (for example no part-on-part contact) and what counts as a cosmetic defect.
  • Attach
    Drawing and model: Sent by you to each shop
    Send each shop the same PDF drawing with part number and revision, and a STEP model; say that the drawing controls if they differ. Neither is accepted here.
  • Attach
    Commercial breakdown: Ask each shop
    Ask for tooling, setup, material, finishing, inspection, packaging, freight and duties quoted separately.

Lead time against your target

Days per stage (example values: replace with what each shop tells you)

The example stage days above add to 30.0 days: 2.0 days over your 28.0-day target. These are placeholders, not a finding about your part: replace them.

  • Material and components5.0 days
  • Making the parts12.0 days
  • Finishing and secondary operations5.0 days
  • Inspection and paperwork3.0 days
  • Transit to you3.0 days
  • Buffer for rework or delay2.0 days
  • Total, stages end to end30.0 days

Dashed mark: your target, 28.0 days from order to arrival.

Stages are added end to end; a shop that overlaps them will beat the sum.

Quotes side by side

Enter the quotes you have received. Leave a field blank if the quote does not state it; blank is not read as zero.

Quote 1
Quote 2
Quote 3

Enter a unit price for a quote you have received, in the fields above, to see its landed total and per-part cost: the unit price times 500 plus one-time fees, finishing and inspection, shipping, and taxes. Nothing here is a price; the amounts are yours.

Ask every shop to quote on

Part
CNC milling, 6061-T6 aluminum
Tolerances
+/- 0.005 in on the mounting holes and bore; +/- 0.010 in general
Finish
Type II clear anodize, threads masked
Quantity
500 parts; price at 250, 500, 1,000
Arrival
28 days from order; partial shipments acceptable
Inspection and documents
First article inspection; Material certificate; Certificate of conformance
Shop quality system
ISO 9001
Ship to
Minneapolis, MN
Price basis
Tooling, setup, material, finishing, inspection, packaging, freight and duties quoted separately; lead time broken out by stage; what the quote assumes about the drawing

Record this requirement

Your request for quotation is recorded as described. No drawings are taken, nothing is quoted or ordered, and no shop is sent your part. If you leave a contact and a shop that runs this process at this volume can be identified, a reply may come; it is not promised. Do not send drawings here: confidential or export-controlled designs belong with a shop under your own agreement. Contact details are stored apart from the requirement and deleted after 180 days.

How the figures are worked out